精品国产乱码久久久久久狼|亚洲无码99亚洲激情一级片|日韩av有码无码不卡五区|欧美日韩一级黄片手机免费在线观看

Power Grid Tansient Abnormal Compensation Scheme

Power Grid Transient Abnormally Compensation Scheme

Overview

Due to eternal interference(such as lightning),the power grid has a transient power outage,witch will cause some important equipment to shut down and affect the stable operation of the system.The AC anti-shake system is connected to the power grid in parallel,using super capacitors to store electric energy,and when the anti-shaking system detects the phenomenon of shaking  in the higher-level power grid,it is immediately put into operation and discharged externally to maintain the stability of the back-level power grid system.When the shaking is over,the anti-shaking system stops discharging externally and turns to over-capacity charging.After the over-capacity full charge,it is transferred to standby operation to prepare the next system for anti-shaking.

 

Key Feature

  • The response speed is fast,and the load transfer is completed within 5ms and the upper power grid is cut off
  • Smooth switching,shock-free access to the power grid
  • Important equipment does not stop and the power supply of the back-end is not affected

Power Grid Tansient Abnormal Compensation Scheme